Project details
- Location — Hale, Altrincham
- Service — Bathroom Renovations
- Duration on site — 3 weeks
Scope of works
- Full tank and waterproofing
- Freestanding bath and floor-standing tap
- Marble-effect wall and floor tiling
- Underfloor heating
- Recessed niche and mirror lighting
The result
A calm, hotel-style bathroom built around a freestanding bath, marble-effect tiling and concealed brassware. Every stage — from strip out to the final walkthrough — was carried out and coordinated by our own team, so the homeowner had a single point of contact throughout.
